Jeremy Kaiser
Manager of Operations
At Dawson PPD, we’re constantly working to improve our system and bring you reliable electricity. Part of that involves deciding between overhead and underground power lines. You might be curious about the pros and cons of each, so let’s break it down.
The Cost Factor
Until recently, underground lines were much more expensive to build. Since 2020, the cost gap has narrowed. This means we consider both options when planning new lines or upgrades, when previously we looked into underground if it was specifically requested or was the only option to successfully connect power.
Finding the Right Fit
Several factors influence our choice. We consider things like the number of customers affected, the type of land, and how long the existing lines have been around. Sometimes, the best solution combines both overhead and underground lines. For example, on a sharp curve in the road, building an overhead line might require many support poles. In such cases, burying the line under the curve might be more cost-effective.
Looks vs. Time
Underground lines are certainly more pleasing to the eye – no poles and wires cluttering the view. However, there’s a trade-off. When there’s a power outage with underground lines, it takes longer to find the problem. We can’t simply drive by and spot the issue. Instead, we need to isolate sections of the line and then pinpoint the exact location of the fault. This might even involve digging in your yard, depending on where the easement is located. We always try our best to minimize any damage during repairs, but sometimes it’s unavoidable.
The Boring Solution (Literally!)
Fortunately, Dawson PPD has invested in a boring machine to make underground lines even more affordable in the long-term. This allows us to install underground lines efficiently with minimal digging, which means less disruption to your property and reduces the risk of future problems like washouts from heavy rain.
The Bottom Line
We understand you want reliable power and an attractive view. By considering all the factors – cost, efficiency, and aesthetics – we can choose the best approach for each situation. We’re committed to keeping the lights on and delivering the best service possible.
OTHER NEWS
Contract Awarded for Dual Substation Improvement
Richard’s Electric of North Platte has been awarded a $2.3 million bid for the upgrade of two rural Dawson Public Power District substations.
Powering young minds
We are committed to empowering our youth to become responsible energy consumers, future leaders in the energy industry and informed citizens who can make a positive impact.
Switching things up
We're committed to delivering reliable electricity to you. That's why we recently replaced a transmission line switch that had reached its service limit. While the original switch served us well for 40+ years, proactive maintenance identified the need for an upgrade....