Dawson PPD receives questions about voltage during irrigation season. The most common are listed here:
If the voltage is okay at the meter, what could be causing the problem at the motor or pivot?
“If there is an excessive voltage drop between the meter and the customer equipment it can be caused by conductor that isn’t sized properly,” says Cole Brodine, Manager of Engineering.
This can occur when a customer upgrades equipment but uses existing wire.
The problem can be more pronounced with booster pumps installed on pivot end guns.
What causes ‘voltage drop?’
Decreased voltage can be caused by the distance between the load and the meter. The longer the wire, the higher the resistance, causing voltage drop. It can also be caused by wiring that is not sized correctly for the load it serves.
It was working earlier in the season. Why are there problems in August?
During the highest demands of the irrigation season, voltages can vary, yet still be within the standard’s tolerances.
Contact Dawson PPD to test the voltage at the meter if you have concerns.
What can Dawson PPD do about it?
If you contact Dawson PPD with a concern about voltage, the District will check voltage at the meter.
If the voltage is within standard values at the meter, the customer needs to contact their electrician to troubleshoot their wiring and equipment.
Can Dawson PPD just turn the voltage up on the power line?
Generally, no. Dawson PPD is required to follow a standard (ANSI C84.1) for voltage requirements. There are high and low values required at the meter.
If Dawson PPD “turns up the voltage” on a power line, it can damage equipment owned by other customers on that line.
| ANSI C84.1 Voltage Standards at the customer’s equipment | ||
| Nominal voltage | Normal Maximum Voltage | Normal Minimum Voltage |
| 120 | 125.0 | 108.0 |
| 208 | 216.7 | 187.2 |
| 240 | 250.1 | 216.0 |
| 277 | 288.6 | 249.3 |
| 480 | 500.2 | 432.0 |
| ANSI C84.1 also has voltage standards for emergency situations. The ANSI standards for voltage at Dawson PPD’s meter are different. Please consult the standard or your electrician for more information. | ||
OTHER NEWS
Dawson PPD Board Approves Wildfire Mitigation Plan, Reviews Financials and 2027 Budget Projections
At the October meeting, the Dawson Public Power District Board of Directors approved a Wildfire Mitigation Plan, reviewed August financial performance, and discussed preliminary projections for the 2027 budget.
Tree Trimming to begin NOVEMBER 2 in HERSHEY
Leetch Tree Service, a contractor hired by Dawson PPD, will begin trimming trees and limbs in the Hershey area starting Monday, November 2, 2026.
Important Transfer Switch Policy Updates You Need to Know
If you are planning to install a backup generator or update your existing standby power setup, please take note of recent updates to Dawson PPD’s installation policies.