(308) 324-2386
load control possible

Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.

Normal load control allows for up to six hours of control on Sundays.

If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.

Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges.  All energy will be billed at the higher rate.

OTHER NEWS

Between the lines: Got solar? Got power! Not so fast…

Between the lines: Got solar? Got power! Not so fast…

Guest column by Cole Brodine, Manager of Engineering So, you just installed a solar renewable generation system. Now, you’ll have power all the time with no interruptions, right? Not so fast! It all depends on a device called an inverter. The typical renewable...

read more
New calling system reports outages faster

New calling system reports outages faster

A new telephone system will make reporting power outages after regular business hours faster. Known as Interactive Voice Response, or IVR, the automated system will take the customer’s telephone or meter number via keypad to quickly report power outages after business...

read more
Your easement questions, answered

Your easement questions, answered

When it comes to our distribution system, all work begins with an easement. The cooperation of our customers — like you — ensure that Dawson PPD’s electric system remains safe and reliable now and for generations to come. “When we propose an easement, we’re looking...

read more
Translate »