Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
Winter storm safety tips
The Consumer Product Safety Commission reports that 50% of all portable generator-related carbon monoxide deaths occur during the winter months (November - February). Space heaters, whether portable or stationary, account for one-third (33%) of home heating fires and...
Safely connect a generator with the transfer switch rebate
Qualifications The transfer switch must be installed by an electrician according to the National Electrical Code. It must have a center “off” position. Once installed, Dawson PPD personnel will inspect and test the switch to ensure it is working properly. A mechanical...