(308) 324-2386
load control possible

Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.

Normal load control allows for up to six hours of control on Sundays.

If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.

Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges.  All energy will be billed at the higher rate.

OTHER NEWS

Alert today, alive tomorrow: Heads up for farm safety

Alert today, alive tomorrow: Heads up for farm safety

  Alert today, alive tomorrow: Heads up for farm safety Stay safe around downed power lines. Consider all lines, equipment and conductors to be live and dangerous. If you are inside farm machinery that makes contact with a downed power line, know what to do! If...

read more
Between the lines: That will never happen

Between the lines: That will never happen

By Gwen Kautz, Dawson PPD General Manager gkautz (at) dawsonpower.com 308-324-2386 I just finished reading an article about shopping malls that are closing across the United States because online shopping is replacing a physical trip to the store. As an avid online...

read more
Know what is below

Know what is below

The 811 process for homeowners For projects that include planting a tree, installing a mailbox or building a deck, among others. Notify – Notify your local one-call center by calling 811 or making an online request 2-3 days before work begins. The one-call center will...

read more
Translate »