(308) 324-2386
load control possible

Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.

Normal load control allows for up to six hours of control on Sundays.

If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.

Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges.  All energy will be billed at the higher rate.

OTHER NEWS

Dawson PPD is making more improvements in the Village of Brady

(July 28, 2017) Lexington, Neb. - A project is underway in the village of Brady with the goal of improving electric reliability.  Poles are being replaced, new conductor wire is being installed and the electric load of the village will be redistributed.  The budgeted...

read more

How are “planned outages” planned?

Ever wonder why Dawson PPD has planned outages and why they choose the dates and times?  We thought we’d share some of the factors that are considered before the decision is made. Can we safely work with the line energized?  Sometimes linemen are able to make repairs...

read more
Translate »