Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
Between the lines: What’s in our future?
By Gwen Kautz, Dawson PPD General Manager gkautz (at) dawsonpower.com 308-324-2386 One of the things the directors asked of me in January was to create my own vision for Dawson Power. I’ve been giving this a lot of thought. My risk taking before was always blanketed...
Generator safety tips
Generator safety tips Never connect a standby generator into your home's electrical system. There are only two safe ways to connect a standby generator to your equipment. Stationary Generator: An approved generator transfer switch, which keeps your house...
Blinks, surges, lightning strikes and outages: Who’s responsible?
Unexpectedly replacing electronics can be a major blow to a household’s budget. If the device stopped working as a result of an electrical problem, many customers contact their power provider in hopes that they’ll pay. In most cases, neither the customer nor the power...