(308) 324-2386
Picture of a man using a device to check for wood decay on a utility pole.

As a not-for-profit utility, Dawson PPD focuses on cost-effectively extending the life of its existing facilities while maintaining adequate levels of safety and reliability. Testing wooden poles helps the District ensure reliability and long life of its equipment, saving customers money in the long run.

Traditionally, pole testing involved a hammer for sounding, a shovel for digging around the base and drilling holes to test for decay. Today, Dawson PPD hires a contractor that uses a scientifically-based system called POLUX as a less-invasive and more accurate form of testing.

POLUX works by sending two, three inch long probes the size of an eight-penny nail into the base of the utility pole. This is the most vulnerable point where decay is most likely to occur on a pole. The probes measure resistance and moisture content of the pole. This information, along with the type of wood the pole is made of and how it was treated are run through a computer program with the pole’s GPS location recorded.

Typically, Dawson PPD uses a Southern Yellow Pine tree for its poles, which should have a resistance of 8,000 pounds per square inch when new. If the measurement falls below 50 percent of the recommended resistance, in this case 4,000 PSI, the pole is marked for replacement.

All of Dawson PPD’s poles are tested every 10 years on a rotating schedule with 10,000-11,000 poles tested annually.

OTHER NEWS

Dawson PPD is making more improvements in the Village of Brady

(July 28, 2017) Lexington, Neb. - A project is underway in the village of Brady with the goal of improving electric reliability.  Poles are being replaced, new conductor wire is being installed and the electric load of the village will be redistributed.  The budgeted...

read more

How are “planned outages” planned?

Ever wonder why Dawson PPD has planned outages and why they choose the dates and times?  We thought we’d share some of the factors that are considered before the decision is made. Can we safely work with the line energized?  Sometimes linemen are able to make repairs...

read more
Translate »