(308) 324-2386
Dawson PPD board members tour the new digger derrick

What has 92 feet and is red all over? Dawson PPD’s newest digger derrick.

The latest addition to the District’s fleet boasts a reach of up to 92 feet, helping our lineworkers reach 70-foot-tall transmission poles with ease. Dawson PPD’s electrical grid upgrade plans include work on several transmission projects in the coming years.

Before acquiring this digger derrick, Dawson PPD rented cranes or hired contractors to complete some of these jobs. The digger derrick eliminates expensive crane rentals and provides long-term cost savings for customers. Dawson PPD anticipates savings to be realized within a year or two.

Dawson PPD’s fleet consists of 123 pieces of equipment, including 12 bucket trucks, 5 digger derricks, 16 maintenance trucks, 3 foreman trucks and a partridge in a pear tree. Okay, maybe not that last part.

The District typically keeps vehicles in its fleet for 10 years, depending on the number of hours the equipment has been used. By monitoring the usage hours and considering feedback from Dawson PPD’s mechanics, the District is able to plan and budget for new vehicles on a schedule.

This planned rotation of vehicles ensures Dawson PPD has the latest, most efficient equipment while keeping costs down for our ratepayers.

OTHER NEWS

Alert today, alive tomorrow: Heads up for farm safety

Alert today, alive tomorrow: Heads up for farm safety

  Alert today, alive tomorrow: Heads up for farm safety Stay safe around downed power lines. Consider all lines, equipment and conductors to be live and dangerous. If you are inside farm machinery that makes contact with a downed power line, know what to do! If...

read more
Between the lines: That will never happen

Between the lines: That will never happen

By Gwen Kautz, Dawson PPD General Manager gkautz (at) dawsonpower.com 308-324-2386 I just finished reading an article about shopping malls that are closing across the United States because online shopping is replacing a physical trip to the store. As an avid online...

read more
Know what is below

Know what is below

The 811 process for homeowners For projects that include planting a tree, installing a mailbox or building a deck, among others. Notify – Notify your local one-call center by calling 811 or making an online request 2-3 days before work begins. The one-call center will...

read more
Translate »