(308) 324-2386
Cole Brodine, Manager of Engineering & IT

As an Engineer, I get a lot of questions about how I chose this job. I became interested in the electric utility industry as a kid. Both my father and my maternal grandfather were farmers and ranchers who have held board positions at a REA. It is what made me aware of the electric utility industry in the first place.

I wanted to go to college and be able to find a good job in a rural area after graduation and ideally, one near where I grew up.

Rural public power districts and cooperatives are well known throughout the country for having good paying jobs with good benefits, and for hiring engineers.

To become an engineer at a utility, I attended the University of Nebraska at Lincoln Engineering College. I was lucky enough to have an internship for Nebraska Public Power District working at their natural gas power plant in Beatrice during its construction. During my senior year of college, I studied for and passed an eight-hour engineering exam called the Fundamentals of Engineering. This test is a requirement to become an “EIT” or “Engineering in Training” under the Nebraska Board of Architects and Engineers.

After graduation, I accepted a full-time position as a Distribution Staking Engineer with NPPD in Kearney. I worked there for four years under the tutelage of a few Professional Engineers, which is a requirement to become a Professional Engineer. I was then able to take and pass another eight-hour exam called the Professional Engineering Exam, as well as an Engineering Ethics exam. This was my final step to becoming a Professional Engineer.

Electrical Engineers in the electric utility industry do quite a few things. We’re responsible for designing the power lines, substations, power plants and equipment that make the electric grid work.

We run power flow and load growth studies to help predict where system upgrades will be needed.

We run safety analyses like Arc-Flash studies and Spill Protection Plans to help keep other employees like lineworkers and electricians safe.

We run economic analyses to determine the most cost-effective ways to provide power, helping keep rates lower. We participate in standards committees to help develop safety rules for the National Electric Safety Code and National Electric Code.

Being an engineer at a rural public power electric utility is interesting and rewarding. You get to be a Jack of all trades. Every day, I’m working on a variety of projects with different employees.

Since I’ve been the Engineering Manager at Dawson PPD, the Engineering Department has accomplished quite a few things.

Dawson PPD has moved to a more modern mapping system. We’ve started designing and building our own large distribution and transmission projects. We implemented a more thorough substation testing and maintenance plan. We’re developing our own Arc Flash Studies and Spill Protection Studies. We implemented a new load management system along with an accompanying text messaging system for customers.

Hopefully Dawson PPD’s General Manager will continue to have me here for years to come. Dawson PPD is a great place to work and central Nebraska is a great place to live!

OTHER NEWS

Between the lines: The cost of reliable power

Between the lines: The cost of reliable power

By Gwen Kautz General Manager 308-324-2386 gkautz(at)dawsonpower.com Our customers have indicated that reliable power is a top priority. And who could blame them? Nobody likes to be without power. When I think about my daily activities, I’m not sure how I could be...

read more

Dawson PPD rate increase to go in effect April 1

February 18, 2020 - Dawson Public Power District will have an average two percent rate increase across all rate classes effective April 1, 2020. The vote for approval was made at the Dawson PPD Board Meeting on February 12. The District has invested more than $135...

read more
Q & A with Electrical Engineer, Cole Brodine

Q & A with Electrical Engineer, Cole Brodine

What kind of projects do you work on? Since we are a small utility, I work on a lot of different things. It includes line design, both distribution and transmission, regulatory requirements like our spill protection plan and PCB removal plan, evaluating line equipment...

read more
Translate »