![Sara Campbell Sara Campbell](https://dawsonpower.com/wp-content/uploads/2022/07/Sara-Campbell-January-2022-scaled.jpg)
Sara Campbell
From Consumer Accounting Representative (front desk) to billing
![Bob Miller Bob Miller](https://dawsonpower.com/wp-content/uploads/2022/04/Bob-Miller.png)
Bob Miller
From Substation Technician to Manager of Purchasing, Facilities and Fleet
![Trever Miller Trever Miller](https://dawsonpower.com/wp-content/uploads/2022/07/Trever-Miller-2020-scaled.jpg)
Trever Miller
From Journeyman Lineman on a Lexington Construction Crew to Substation Technician
![Casandra Way Casandra Way](https://dawsonpower.com/wp-content/uploads/2022/07/Casandra-Way-2020-scaled.jpg)
Casandra Way
From Consumer Accounting Representative to Engineering Coordinator
OTHER NEWS
Merger decision to be made by Spring
The Nebraska Power Review Board has 60 days to make its final decision of the proposed new entity, Platte River Public Power and Irrigation District.
Smith selected to represent Dawson PPD at Youth Tour
Kearney Catholic High School Student Austin Smith was selected to represent Dawson Public Power District at the Nebraska Rural Electric Association Youth Tour in Washington, D.C.
Let’s clear the waters and talk about the merger
FAQ of the merger to create Platte River Public Power and Irrigation District