![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
Economic development projects are ahead for Dawson PPD
LEXINGTON, Feb. 12, 2024 - Dawson Public Power District’s February board agenda focused on the District’s future. Chris Bruns, Lincoln County Commissioner, spoke about the creation of the Nebraska International Port of the Plains and the larger industrial rail park...
Smith selected to represent Dawson PPD at Youth Tour
Kearney Catholic High School student Onyx Smith was selected to represent Dawson Public Power District at the Nebraska Rural Electric Association Youth Tour in Washington, D.C. Smith is the daughter of Todd and Jody Smith.
Dawson PPD’s financial responsibility is recognized
Feb. 5, 2024 - LEXINGTON, Neb. “I am pleased to announce that Dawson Public Power District received a significant bond rating upgrade from Standard & Poor's, moving from an A to an A+,” said Dawson PPD Board President Dan Muhlbach. “These bond upgrades are...