(308) 324-2386
load control possible

Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.

Normal load control allows for up to six hours of control on Sundays.

If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.

Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges.  All energy will be billed at the higher rate.

OTHER NEWS

Between the lines: A crystal ball

Between the lines: A crystal ball

By Gwen Kautz, General Manager gkautz at dawsonpower.com 308-324-2386 If you can predict the future, we’d like to hire you. I suppose if you could do that, you could work for anyone, anywhere and make a fortune. So, for now, Dawson PPD will have to settle on the same...

read more

Customer surveys to begin in February

Dawson PPD will be conducting a customer survey in February. The surveys will be fulfilled by phone or email. NRECA Market Research Services has been contracted to do the survey on behalf of the District.   February 2019

read more
Translate »