Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
Local partnership, global flavor
Copperstone Foods is beefing up the local Eustis economy with the help of Dawson PPD.
Energy efficiency tip of the month
The holiday season is upon us, and that means we'll be using more energy inthe kitchen. When possible, cook with smaller countertop appliances instead of the stovetop or oven. Smaller appliances like slow cookers, air fryers and Instant Pots consume less energy. When...
4 steps to keep you cyber safe
4 steps to keep you cyber safe – multifactor authentication, software updates, link clicks and strong passwords.