![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
Between the lines: Today’s energy, tomorrow’s vision.
For much of my career, vision was a word I would use to describe others, but not myself.
Notice to bidders
NOTICE TO BIDDERS Substation Construction Project Sealed proposals for the construction, including the supply of necessary labor, equipment and some materials for two rural electric projects of Dawson Public Power District, (hereinafter called the “Owner”) to be known...
Dawson PPD’s board reviews the audit and financial standards
Dawson PPD’s 2023 audit report was given by Bob Beran, of the Dana F. Cole & Company accounting firm, at the June 5, board meeting. He said that the district is financially sound, consistently surpassing all required benchmarks. Dawson PPD is audited annually. The...