![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
2023 Dawson PPD annual report
In 2023, the District recognized adequate margin to cover expenses and fund planned investments in the power system that reliably serves our customers.
Between the lines: Today’s energy, tomorrow’s vision.
For much of my career, vision was a word I would use to describe others, but not myself.
Notice to bidders
NOTICE TO BIDDERS Substation Construction Project Sealed proposals for the construction, including the supply of necessary labor, equipment and some materials for two rural electric projects of Dawson Public Power District, (hereinafter called the “Owner”) to be known...