![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
KneeKnocker Woods: A decade of thrills and chills
Just west of Gibbon on Highway 30, among the sprawling acres of Icon Poly, an eerie transformation takes place every October.
Why do we have public power, anyway?
Public power is an American tradition that is deeply rooted in our community, and its significance remains as vital today as it was over 80 years ago when Dawson PPD was first established.
Between the lines: What happened to the merger?
Despite claims of victory by the opposition, the reality is that all south-central Nebraska lost.