![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
Working together for irrigators
The Twin Platte Natural Resource District needed to document irrigation groundwater usage. They could have installed water meters, but the meters were not cost effective. And water meters traditionally are only read once a year, after irrigation season. Instead, they...
Avoid electrical fires
It is not safe for unqualified individuals to pull a meter to disconnect power.
Energy efficiency upgrades to help you save this summer
Spring and summer are opportune times for home upgrades and DIY projects. If you’re planning to make improvements to your home, consider upgrades that promote better efficiency.