![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
Saiz named Operations Coordinator
Roxanne Saiz has accepted the position as Operations Coordinator. She previously held a position at Dawson PPD as a Consumer Accounts Representative.OTHER NEWS
Howell joins Dawson PPD
Skylar Howell has joined Dawson PPD as a Consumer Accounts Representative.
Save 20 percent on electric lawn and garden tools
Dawson PPD offers an incentive to those looking to purchase new tools for their yard.