![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
BETWEEN THE LINES: Broadband internet and utility pole attachments
Dawson PPD is very interested in rural broadband. We will do our best to assist companies to deploy to our rural areas while ensuring that the costs associated with it are not the responsibility of our customers.
Dawson PPD maintenance lineworker territories
Dawson PPD has lineworkers stationed over its entire district. This helps Dawson PPD have a faster response time to power outages and spreads the workload among its lineworkers.
Energy efficiency tip of the month
Washing windows and screens is a great way to practice energy efficiency during spring cleaning.