![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
Electricity supply: Looking out for you
Dawson Public Power District customers trust that electricity is available and dependable. But what about the headlines predicting energy shortfalls? “First, you need to know that there are different levels of entities who are working to ensure electrical capacity and...
BETWEEN THE LINES: A year in review
Dawson PPD follows its mission statement in this 2022 year end review.
Blazing her own trail
Operations Coordinator Cheri Derrick retires from Dawson PPD.