![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
Introducing online outage reporting
Customers with a SmartHub account may report a power outage virtually through a desktop computer or the mobile app.
Gibbon man brightens holiday season with light display
Steve Faber is no stranger to going all out for Christmas decorations.
Ackerman named Dawson PPD Manager of Finance and Administration
Dawson Public Power District is pleased to announce the hiring of Carmen Ackerman as Manager of Finance and Administration.