(308) 324-2386
load control possible

Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.

Normal load control allows for up to six hours of control on Sundays.

If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.

Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges.  All energy will be billed at the higher rate.

OTHER NEWS

Twelve values of the merger

Twelve values of the merger

When we talk to Dawson Public Power District customers about this opportunity, something commonly asked is “why?” We usually hear that customers do not care what we do so long as we continue to provide low-cost, reliable power. When they flip the light switch, it better come on. We know this industry well and we care about all of this on your behalf. Our efforts will continue doing what we do best using a different, but diverse, and better business model.

read more
Translate »