![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
The final chapter of a colorful career
Nancy Davenport is retiring after 37 years of service.
Testing poles with science
Testing wooden poles helps the District ensure reliability and long life of its equipment, saving customers money in the long run.
You’re invited to the Dawson PPD Customer Meeting
RSVP for Dawson PPD’s Customer Meeting on September 14, 2022. The event will begin at 1:00 p.m. and end at 6:00 p.m. Supper is provided. The meeting will take place at Dawson PPD’s headquarters (75191 Rd 433, Lexington).