Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
SUNDAY LOAD CONTROL FOR IRRIGATORS 8/7/22
Load control is possible on Sunday, August 7, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Irrigators are encouraged to pay attention to text messages, emails KRVN 880 AM announcements or DawsonPower.com for updates. You...
Holding ourselves to a higher standard
A culture of safety starts with each employee. Together, Dawson PPD is holding itself to a higher standard that benefits everyone.
Austin Roemmich joins Dawson PPD
Austin Roemmich has joined Dawson PPD as a Tree Control Laborer. His duties began in July.