![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
New employees
These new employees recently joined Dawson PPD: Tyler Anthony, Roxanne Brackney, Jeanne Leick and Tanner Ostermeyer.
Summer energy efficiency tip – ceiling fans
Run ceiling fans counter-clockwise to create a cooling effect. Ceiling fans cool people, not rooms. Turn them off when leaving the room to conserve energy.
Employees hired from within
Sara Campbell, Bob Miller, Trever Miller and Casandra Way were recently promoted from within.