![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
Interest in numbers rounds out Hobelman’s 32-year career
“If I’ve learned anything in life, it’s that you just have to laugh,” Hobelman said. “Don’t take life too seriously.”
What you need to know about induction cooking
Induction cooking is one of the most efficient, safest and most precise ways to prepare food. Unlike traditional electric or gas cooktops and stovetops, no flame or burner is necessary.
Ask the board: A conversation with Pat Hecox
Dawson PPD Board President and Nebraska Rural Electric Association Board President