![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
Fresh off the farm
Raw milk is a trend that consumers are starting to latch on to, but it can be difficult to find a supplier. Fortunately for central Nebraska, The Milk House serves high quality, nutritious raw milk with the help of its six Jersey and Jersey-cross cows. Rancher...
The pros and cons of overhead and underground power lines
Overhead Pros: Less expensive to build and repair Easier to spot faults/damage Can be built on any terrain Cons: Susceptible to wind, ice and snow More vulnerable to damage from trees and vegetation More vulnerable to blinks caused by animals Susceptible to damage...
Between the lines: Merger update
It’s time to update you on the possible merger between Dawson Public Power District and The Central Nebraska Public Power and Irrigation District. February was a busy month and an important milestone in the process. The districts held a joint board meeting in Kearney...