(308) 324-2386
load control possible

Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.

Normal load control allows for up to six hours of control on Sundays.

If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.

Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges.  All energy will be billed at the higher rate.

OTHER NEWS

Between the lines: The cost of reliable power

Between the lines: The cost of reliable power

By Gwen Kautz General Manager 308-324-2386 gkautz(at)dawsonpower.com Our customers have indicated that reliable power is a top priority. And who could blame them? Nobody likes to be without power. When I think about my daily activities, I’m not sure how I could be...

read more

Dawson PPD rate increase to go in effect April 1

February 18, 2020 - Dawson Public Power District will have an average two percent rate increase across all rate classes effective April 1, 2020. The vote for approval was made at the Dawson PPD Board Meeting on February 12. The District has invested more than $135...

read more
Q & A with Electrical Engineer, Cole Brodine

Q & A with Electrical Engineer, Cole Brodine

What kind of projects do you work on? Since we are a small utility, I work on a lot of different things. It includes line design, both distribution and transmission, regulatory requirements like our spill protection plan and PCB removal plan, evaluating line equipment...

read more
Translate »