(308) 324-2386
Picture of a man using a device to check for wood decay on a utility pole.

As a not-for-profit utility, Dawson PPD focuses on cost-effectively extending the life of its existing facilities while maintaining adequate levels of safety and reliability. Testing wooden poles helps the District ensure reliability and long life of its equipment, saving customers money in the long run.

Traditionally, pole testing involved a hammer for sounding, a shovel for digging around the base and drilling holes to test for decay. Today, Dawson PPD hires a contractor that uses a scientifically-based system called POLUX as a less-invasive and more accurate form of testing.

POLUX works by sending two, three inch long probes the size of an eight-penny nail into the base of the utility pole. This is the most vulnerable point where decay is most likely to occur on a pole. The probes measure resistance and moisture content of the pole. This information, along with the type of wood the pole is made of and how it was treated are run through a computer program with the pole’s GPS location recorded.

Typically, Dawson PPD uses a Southern Yellow Pine tree for its poles, which should have a resistance of 8,000 pounds per square inch when new. If the measurement falls below 50 percent of the recommended resistance, in this case 4,000 PSI, the pole is marked for replacement.

All of Dawson PPD’s poles are tested every 10 years on a rotating schedule with 10,000-11,000 poles tested annually.

OTHER NEWS

Between the lines: Distribution charge to increase

Between the lines: Distribution charge to increase

An independent cost of service study was reviewed in depth at the April board meeting. Our priorities at Dawson PPD have been the same since the beginning: To bring our customers safe, reliable, and affordable electric power. Our board works hard to make sound...

read more

Dawson PPD raises residential rate Distribution Charge

(April 30, 2018) Lexington, Neb. – Dawson Public Power District will increase its Distribution Charge by one dollar for all General Service Rate and A-SH General Service Electric Heat Rate customers. This change will be in effect with May statements. The General...

read more

Dawson PPD announces scholarship winners

(April 16, 2018) Lexington, Neb. – Dawson Public Power District has awarded a total of $3,000 in scholarships to two high school seniors. Zachary Beckenhauer of Cozad was awarded the Dawson PPD Utility Line Scholarship. Evan Palmer of Kearney was selected to receive...

read more
Translate »