![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
Empowering tomorrow’s youth
Dawson PPD partnered with the Nebraska Rural Electric Association to provide unique learning experiences for Nebraska teens.
Between the lines: Liquid fertilizer plant chose to work with PRPPID
After the public announcement of the Project Meadowlark liquid fertilizer plant in Gothenburg, many are wondering why The Central Nebraska Public Power and Irrigation District and Dawson Public Power District were involved. Was it because of the proposed merger? The answer may surprise you.
Dawson PPD anticipates load control for most of the week
Dawson PPD irrigation customers can expect at least four days of irrigation load management during the week of July 24-July 31, 2023.