Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
Dawson Public Power District Sponsors Lexington Student for Leadership Camp
Dawson Public Power District is proud to announce its sponsorship of Rigo Arias, a Lexington High School student, to attend the 2024 Nebraska Rural Electric Association Youth Energy Leadership Camp.
Bump Up Pots offer foolproof flower power
Here, at Open Air Nursery, owned by husband-and-wife team Clark and Kelli Plihal, blooms a unique concept – the Bump Up Pot.
Going way, way up
What has 92 feet and is red all over? Dawson PPD’s newest digger derrick.
The latest addition to the District’s fleet boasts a reach of up to 92 feet, helping our lineworkers reach 70-foot-tall transmission poles with ease.