(308) 324-2386
load control possible

Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.

Normal load control allows for up to six hours of control on Sundays.

If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.

Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges.  All energy will be billed at the higher rate.

OTHER NEWS

Merger update: Going forward from here

Merger update: Going forward from here

In mid-February, the Nebraska Power Review Board heard testimony about the proposed merger of The Central Nebraska Public Power and Irrigation District and Dawson Public Power District. The PRB asked for an extension of the normal 60-day deadline for a decision....

read more

Sign it online

Would you like a digital version of annual irrigation paperwork instead of mailed forms? Let us know! The goal is to streamline the process in 2024, reducing paper and postage. Two forms will be available electronically in 2024: the verification of customer...

read more
Translate »