(308) 324-2386
load control possible

Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.

Normal load control allows for up to six hours of control on Sundays.

If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.

Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges.  All energy will be billed at the higher rate.

OTHER NEWS

Volunteers needed for therapy horse program

Volunteers needed for therapy horse program

Volunteers are the heart of every non-profit organization, and the Kearney Therapeutic Horseback Riding Program is no exception. The independent, non-profit organization is dedicated to fostering emotional, physical and social well-being through horseback riding. It is designed to meet the needs of individuals of all ages and disabilities.

read more
Turning over the torch

Turning over the torch

After 28 years of service, Engineering Coordinator Rose Welch is ready to pass the torch. “I’m extremely happy that I was able to carry one of the many torches at Dawson PPD for 28 years, and I’m honored to now hand the torch to the next generation of Dawson PPD,” she...

read more
Translate »