(308) 324-2386
load control possible

Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.

Normal load control allows for up to six hours of control on Sundays.

If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.

Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges.  All energy will be billed at the higher rate.

OTHER NEWS

Shortages cause delays for electric customers

Building a new home, grain bin site or converting an irrigation well to electricity? Material shortages may cause delays in getting power to your property. While Dawson Public Power District has an inventory of equipment, the district is not receiving all the material...

read more
Translate »