![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
Guest column: Why I chose a career as an electrical engineer
Cole Brodine, Dawson PPD Manager of Engineering & IT, discusses his career choice
A career with heart
After 33 years of service, Jean Edeal has retired from Dawson PPD.
Dawson PPD Board Subdivision Boundaries Redrawn
The Dawson Public Power District Board Subdivision Boundaries were redrawn in response to population data collected by the 2020 Census.