(308) 324-2386
load control possible

Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.

Normal load control allows for up to six hours of control on Sundays.

If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.

Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges.  All energy will be billed at the higher rate.

OTHER NEWS

Between the lines: Beyond 2020: Phase 1 results

Between the lines: Beyond 2020: Phase 1 results

May 2021 By Gwen Kautz Dawson PPD General Manager gkautz (at) dawsonpower.com 308-324-2386 To study the possible merger, the consultant needed lots of information. Dawson PPD submitted over 49 pieces of information in which some pieces contained data for five and 10...

read more

Dawson PPD awards $1,500 STEM Scholarship to Cozad student

March 31, 2021 Dawson Public Power District has awarded Landry Geiger a $1,500 STEM scholarship to further their education. Geiger is a senior at Cozad High School and is the child of Jon and Julie Geiger. In his essay, Geiger said that he plans to study computer...

read more
Translate »