(308) 324-2386
load control possible

Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.

Normal load control allows for up to six hours of control on Sundays.

If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.

Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges.  All energy will be billed at the higher rate.

OTHER NEWS

Between the lines – 2020: Should we be thankful?

Between the lines – 2020: Should we be thankful?

By Gwen Kautz General Manager 308-324-2386 gkautz(at)dawsonpower.com How many of us go about our daily lives, living in a vacuum of sorts? By vacuum, I’m talking about living/working/being in the same routine. Didn’t 2020 disrupt that? What’s there to be thankful for?...

read more

4 ways to save energy in the kitchen

1. Cook with smaller appliances A toaster or convection oven uses one-third to one-half as much energy as a full-sized oven, according to the Department of Energy. 2. Unplug appliances that draw phantom energy load Some appliances may draw energy even when they’re not...

read more
Ghost Towns: A look at the past

Ghost Towns: A look at the past

Buffalo County Buda Buda holds the distinction of being the oldest town in the county. The town was originally named Kearney. In 1872, the name was changed to Shelby because of its similarity to Kearney Junction, a town five miles distant. Later, a station in the...

read more
Translate »