(308) 324-2386
load control possible

Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.

Normal load control allows for up to six hours of control on Sundays.

If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.

Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges.  All energy will be billed at the higher rate.

OTHER NEWS

Dawson PPD participates in Harvest Safety Tour

Dawson PPD participates in Harvest Safety Tour

  Dawson PPD had the opportunity to participate in NPPD's Harvest Safety Tour on September 2. The goal of the event was to increase the public's awareness of safety during the harvest season. The event was held at the Buffalo County Fairgrounds in Kearney. Dawson...

read more
Renovating your home? Be sure it is up to code.

Renovating your home? Be sure it is up to code.

  With many of us staying in rather than going out, homeowners are looking to renovate their space into a comfortable getaway. Don't overlook the electrical wiring in your home. Each year, electrical malfunctions account for 35,000 home fires causing over 1,130...

read more
Translate »