(308) 324-2386
load control possible

Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.

Normal load control allows for up to six hours of control on Sundays.

If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.

Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges.  All energy will be billed at the higher rate.

OTHER NEWS

Celebrating Engineering Week

Celebrating Engineering Week

Engineers week is February 16-22. These professionals are changing the world all the time with creative, practical solutions for things that matter. At Dawson PPD, we are proud to have an entire department dedicated to the engineering profession. The Engineering...

read more
Between the lines: Strategic planning

Between the lines: Strategic planning

By Gwen Kautz General Manager 308-324-2386 gkautz(at)dawsonpower.com   In January, the board of directors and management team met with the goal to look at how we can better serve our customers and our company over the next three years. We talked about what do you...

read more

Dawson PPD Board elects new officers

(January 20, 2020) Lexington, Neb. – The Dawson Public Power District Board of Directors voted in new officers at the January Board Meeting. The officers were sworn in and will begin their duties in February 2020. Each officer’s term is for one year. The new officers...

read more
Translate »