(308) 324-2386
Picture of a man using a device to check for wood decay on a utility pole.

As a not-for-profit utility, Dawson PPD focuses on cost-effectively extending the life of its existing facilities while maintaining adequate levels of safety and reliability. Testing wooden poles helps the District ensure reliability and long life of its equipment, saving customers money in the long run.

Traditionally, pole testing involved a hammer for sounding, a shovel for digging around the base and drilling holes to test for decay. Today, Dawson PPD hires a contractor that uses a scientifically-based system called POLUX as a less-invasive and more accurate form of testing.

POLUX works by sending two, three inch long probes the size of an eight-penny nail into the base of the utility pole. This is the most vulnerable point where decay is most likely to occur on a pole. The probes measure resistance and moisture content of the pole. This information, along with the type of wood the pole is made of and how it was treated are run through a computer program with the pole’s GPS location recorded.

Typically, Dawson PPD uses a Southern Yellow Pine tree for its poles, which should have a resistance of 8,000 pounds per square inch when new. If the measurement falls below 50 percent of the recommended resistance, in this case 4,000 PSI, the pole is marked for replacement.

All of Dawson PPD’s poles are tested every 10 years on a rotating schedule with 10,000-11,000 poles tested annually.

OTHER NEWS

3 tips to show your pets some love

3 tips to show your pets some love

We love our pets! They’re part of the family. But our pets are unaware of the dangers posed by plugs, wires and other electrical devices in our homes. When in doubt, look at your electrical setup through the eyes of your furry friends to keep them safe. Keep power...

read more
Board officers elected

Board officers elected

The Dawson PPD Board of Directors elected its officers at the January Board Meeting. Officer positions are elected annually. PresidentPat Hecox, Gothenburg Vice PresidentDan Muhlbach, Kearney TreasurerCraig Wietjes, Riverdale OTHER NEWS

read more
What are leased towns?

What are leased towns?

cluding the poles, wires, transformers and meters. Dawson PPD collects a lease payment as set by the town on each monthly electric bill. This appears as a line item on customers’ bills titled “village-imposed lease payment adjustment.” Then, the payment is remitted back to the community on a schedule set by community leaders.

read more
Translate »