![load control possible-1 load control possible](https://dawsonpower.com/wp-content/uploads/2022/08/load-control-possible-1.png)
Load control is possible on Sunday, August 14, 2022. All of Dawson PPD’s irrigation load management groups are eligible for Sunday control. Also, a 9:00 a.m. start time may occur on Friday (8/12) and/or Saturday (8/13). Irrigators are encouraged to pay attention to text messages, emails, Dawson PPD Twitter, KRVN 880 AM announcements or DawsonPower.com for updates.
Normal load control allows for up to six hours of control on Sundays.
If a farmer or irrigation tech needs time to fix an irrigation system, Dawson PPD can override the load control system. Call 308-324-2386.
Also note that customers can change their load management control option once per season. There is a fee for making the change and the customer needs to pay for the difference in horsepower demand charges. All energy will be billed at the higher rate.
OTHER NEWS
Between the lines: 1 + 1 > 2
A timeline has been established to move through the merger evaluation process. These dates are fluid, but we hope the respective boards can vote on Phase 2 no later than January 2022.
5 steps to take when approached by a solar or wind developer
5 steps to take when approached by a solar or wind developer
Need help with bills?
The U.S. Department of Energy’s Weatherization Assistance Program installs energy efficiency measures in the homes of qualifying homeowners free of charge. The Community Action Partnership of Mid-Nebraska administers these funds. The mission of WAP is to reduce energy...